Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 8 results ...

Abu Dabous, S and Alkass, S (2008) Decision support method for multi-criteria selection of bridge rehabilitation strategy. Construction Management and Economics, 26(08), 883–93.

Bowen, P, Dorrington, R, Distiller, G, Lake, H and Besesar, S (2008) HIV/AIDS in the South African construction industry: an empirical study. Construction Management and Economics, 26(08), 827–39.

  • Type: Journal Article
  • Keywords: HIV/AIDS; construction industry; construction worker; South Africa
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446190802061225
  • Abstract:
    South Africa has one of the highest HIV/AIDS prevalence rates, with 11% of South Africans currently estimated to be HIV positive. The construction industry has one of the highest prevalence rates of any economic sector. To indicate the nature and extent of HIV/AIDS in the SA construction industry and to establish the degree of association between certain risk factors and the prevalence of HIV/AIDS, the results of HIV tests on 10 243 construction employees drawn from 55 companies nationwide are reported. In addition to the HIV test, a test for tuberculosis (TB) was conducted but proved inconclusive. Permanently employed, semi-skilled operators and drivers, as well as skilled employees, have the highest prevalence rate of HIV/AIDS; even greater than casual labourers. The group displaying the next highest prevalence is temporarily employed general labourers. With regard to age, middle-aged employees were shown to be the most at risk. Geographically, KwaZulu-Natal exhibits the highest HIV prevalence rate, with the Western Cape the lowest. It is recommended that a compulsory, industry-wide initiative be adopted, funded via levies, involving education, testing and treatment programmes supported via formal certification as part of the completion of work certification process.

Chen, J-H, Yang, L-R, Chen, W H and Chang, C K (2008) Case-based allocation of onsite supervisory manpower for construction projects. Construction Management and Economics, 26(08), 805–14.

Doloi, H (2008) Application of AHP in improving construction productivity from a management perspective. Construction Management and Economics, 26(08), 841–54.

Menches, C L, Hanna, A S, Nordheim, E V and Russell, J S (2008) Impact of pre-construction planning and project characteristics on performance in the US electrical construction industry. Construction Management and Economics, 26(08), 855–69.

Skitmore, M (2008) First and second price independent values sealed bid procurement auctions: some scalar equilibrium results. Construction Management and Economics, 26(08), 787–803.

Wong, J M W, Chiang, Y H and Ng, T S (2008) Construction and economic development: the case of Hong Kong. Construction Management and Economics, 26(08), 815–26.

Yip, B, Rowlinson, S and Siu, O L (2008) Coping strategies as moderators in the relationship between role overload and burnout. Construction Management and Economics, 26(08), 871–82.